ShipCars UK logoSHIPCARSUKGlobal Freight Forwarding

Project & heavy lift · Oceania

Project Cargo Shipping to Papua New Guinea

Flat rack, open top, breakbulk and mafi solutions into Port Moresby, Lae on an average 42 day passage.

Route surveys, lift plans, abnormal load haulage and destination discharge planning handled on one file.

ShipCars UK moves project, heavy lift and out-of-gauge cargo from the United Kingdom to Papua New Guinea using flat racks, open tops, breakbulk stowage and RoRo mafi trailers into Port Moresby, Lae. Every project starts with measurements and a lift plan, not a guess: we survey the unit, work out how it stows, and price the actual space and lifting gear it consumes.

Pricing guide

Project & Out-of-Gauge Rates to Papua New Guinea

Port to port · Port Moresby · transit approx. 42 days

Flat rack, in-gaugeUp to 12 m x 2.4 m x 2.4 mfrom £5,062
Flat rack, out-of-gaugePriced on overwidth and overheight slots lostfrom £6,926
Open top with tarpaulinTop-loaded machinery and long itemsfrom £4,662
Breakbulk / conventional (per freight tonne)W/M basis, 1 tonne or 1 cbm whichever is greaterfrom £240
RoRo static cargo on mafi trailerNon-runners, gensets, tanks and modulesfrom £3,596
Heavy lift over 45 tCrane study and method statement includedquoted per lift
Route survey and lift planAbnormal load routing to the UK berth£450 – £1,500
Abnormal load haulageEscorts and police notification where requiredquoted per movement
Project marine insuranceIncludes lifting risk and DSU on requestfrom 1.8% of value

Out-of-gauge pricing depends on final measured dimensions and the deck slots blocked.

Project, heavy lift and out-of-gauge cargo to Papua New Guinea

Cargo becomes "project" the moment it stops fitting inside a standard container. Anything over 2.35 m wide, 2.35 m high or 12 m long is out of gauge and is priced on the slots it blocks as well as its own footprint. We move excavators, transformers, generators, tanks, steel structures, prefabricated buildings and complete production lines from the UK to Port Moresby, Lae.

Equipment we use into Port Moresby

  • 40ft flat racks with collapsible ends for machinery up to around 40 tonnes
  • Open top containers for over-height cargo craned in and sheeted
  • Conventional breakbulk stowage on multipurpose vessels
  • RoRo mafi trailers for tracked and non-running plant
  • Heavy lift and tandem crane operations where the unit exceeds gear capacity

UK abnormal load handling

The UK leg is often harder than the sea leg. Abnormal loads need route surveys, movement orders, escorts and in some cases police notification, and the berth must have the crane capacity and laydown area to receive the unit. We handle the survey, the haulage, the port booking and the lifting method statement as one package and will tell you early if a different loading berth saves days or thousands of pounds.

Discharge and delivery in Papua New Guinea

At Port Moresby the same questions apply in reverse: discharge crane capacity, customs treatment of capital equipment, inland route restrictions and the final lift onto foundations. We appoint a destination agent in Papua New Guinea at quotation stage so the discharge plan is agreed before the vessel sails, and arrange project marine insurance that covers the lifting risk as well as the voyage.

Request a project cargo quotation for Papua New Guinea

Send us the dimensions, weight and centre of gravity of each unit, together with the collection address and required delivery point in Papua New Guinea, and we will return a written scope: what is included, what your consignee pays locally, and the assumptions behind the price.

Discharge ports in Papua New Guinea

Ports we sail to in Papua New Guinea

Average port-to-port transit 42 days · weekly departures

UK loading ports

  • Tilbury
  • London Gateway
  • Southampton
  • Felixstowe
  • Liverpool

Papua New Guinea discharge ports

  • Port MoresbyRoRo ramp, container terminal and inland haulage available
  • LaeRoRo ramp, container terminal and inland haulage available

Moving project cargo to Papua New Guinea

Step 1

Quote & booking

Rates, sailing or flight options confirmed in writing.

Step 2

UK collection

Nationwide collection or delivery into our Tilbury depot.

Step 3

Loading & packing

Lashing, crating, palletising and photographic record.

Step 4

Customs & export

Export entry, NES clearance and documentation released.

Step 5

Transit & delivery

Tracking updates until the cargo lands with your consignee.

Project cargo we move to Papua New Guinea

Surveyed, lift-planned and lashed to a carrier-approved stowage plan.

  • Excavators, dozers, cranes and quarry plant
  • Transformers, generators and switchgear
  • Prefabricated buildings and modular units
  • Agricultural combines, sprayers and balers
  • Drilling equipment and oilfield modules
  • Boats, yachts and marine engines
  • Steel structures, tanks and pressure vessels
  • Complete factory and production line relocations

What we need to quote accurately

  • Length, width and height of each piece, and the total weight
  • Centre of gravity and designated lifting points
  • Collection postcode and any access restrictions on site
  • Final delivery address in Papua New Guinea and the discharge port preferred
  • Whether the unit rolls, is static, or must be craned

Send us dimensions and weights for Papua New Guinea and we will build a lift plan and a price.

Request a Quote